Aristeo Construction
Manufacturing

General Motors Flint Assembly

General Assembly Strategic Supplier

General Motors Flint Assembly - Manufacturing - Aristeo Construction  - Screen_Shot_2016-05-24_at_11

This General Assembly equipment and tooling installation project included overall layout integration of vehicle assembly systems.  Aristeo and its specialty contractors were responsible for the following equipment installation scope of work:

  • Design, fabrication, and installation of all overhead steel to support new conveyor skid system
  • Design and installation of the chain on edge conveyor
  • Design and Installation of skid delivery conveyor skid system
  • Extending and modifying the FESM conveyor system with new fork transfers
  • Controls systems design and integration

Aristeo provided monthly Factory Cad “fly thru’s” of project progress.  Upon project completion, we received the NMAPC Zero Injury Award on the project with over 70,000 man-hours and no recordable incidents.

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Georgetown, Kentucky 
Owner: Toyota Motor 
Project Value: $65,000,000

Reborn Paint Package

Location: Lincoln, Alabama 
Owner: Honda Motor Company  
Project Value: $2,100,000

Line 2 Modifications

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Warren, Michigan 
Owner: General Motors 
Project Value: $18,000,000

Vehicle Engineering Center East Renovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $14,000,000
 

Aerodynamics Lab & Reduced Scale Wind Tunnel

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Plymouth, Michigan
Owner: Hyundai Mobis 
Project Value: $7,000,000
 

Mobis North America Technical Center

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management
Aristeo has worked with Marathon since 2005 and has never had a recordable safety incident on any of our projects. Their dedication to safety and doing work right has made Aristeo a preferred contractor. We are impressed by the service Aristeo provides and will continue to recommend their team on upcoming projects. Marathon Petroleum Company LLC
|