Aristeo Construction
Steel

Honda Motor Company MFG of Alabama

Line 2 Modifications 

Aristeo's Honda Motor Company Line One Innovation Project

Honda Motor Company awarded Aristeo the $2.1 million line 2 Modifications project for their Honda Manufacturing of Alabama facility. The project required an extension of the existing conveyor line so he facility could accommodate a new product line. As general contractor on this project, Aristeo managed seven different trades, including our own self perform crews that performed demolition, excavation, steel fabrication and installation, and concrete placement services. 

For this project, Aristeo provided demolition services for 32,000 square feet of concrete floor in the facility, excavating 2,000 cubic yards of material and lowering the floor by three feet across two-thirds of the space. Aristeo also poured 1,100 cubic yards of concrete and placed both resteel and steel embeds to support the weight of facility equipment.

Placing concrete in an active facility presented a unique problem – the space would not fit a traditional concrete pump truck and they could not disturb plant production. Aristeo proactively developed a solution and utilized a spider boom to extend the reach of the pump truck. This allowed concrete to be placed precisely where needed with minimal disruption to plant activities. We also utilized a truss screed to provide a more uniform finish for the concrete surface.

This project also required the existing plant electrical and mechanical utilities to be extended for the new lines. Aristeo oversaw subcontractors as they extended electrical systems by 2,000 linear feet and added 1,800 feet of new piping – both of which needed to be extended through the active plant to the new space. Much of this work, as well as the concrete placement work, was completed during night and weekends to minimize disruption to the plant.

The project near completion and has proceeded on budget and with an excellent safety record of zero incidents.

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Georgetown, Kentucky 
Owner: Toyota Motor 
Project Value: $65,000,000

Reborn Paint Package

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Detroit, Michigan
Owner: EWI Worldwide
Project Value: $1,000,000

NAIAS Exhibit, Steel Framing

Location: Detroit, Michigan
Owner: Detroit Entertainment LLC
Project Value: $11,000,000
 

Facade Replacement

Location: Detroit, Michigan
Owner: Detroit Building Authority
Project Value: $3,500,000
 

Headquarters Building Restoration
The Aristeo team has done a great job executing the Pinnebog Project.聽 Project execution and coordination with all parties was performed at the highest level.聽 Great priority focus on job site safety resulting in zero instances. 聽Thank you for a job well done! DTE Energy Co.
|