Aristeo Construction
Steel

Toyota Motor Manufacturing Kentucky

Reborn Paint Package

Aristeo's Honda Motor Company Line One Innovation Project

 

  • 475,000 square foot new paint shop at TMMK facility 
  • 2,000 cubic yards of concrete for site work and foundations 
  • 125 tons of resteel for footings, grade beams, walls, piers, and flatwork
  • Extensive demolition of concrete and asphalt pavement, and earthwork
  • Drilled piers, spread footings, formed piers, foundation and retaining walls 
  • Underground fire protection included new fire mains, hydrants, and lead-ins
  • Firewater storage tank and associated storm structures, RCP piping, and steel
  • Demolition of existing site lighting, relocation of light poles and fixtures, associated rework of terminations of underground feeders, and building grounding system
  • Rerouting of existing underground water and natural gas
  • New asphalt and concrete pavements, sidewalks, and stoops around perimeter of new building 
  • New siding, roofing, and overhead doors
  • New restroom and locker room installation 
  • Office area complete with architectural finishes 
  • New power distribution, including nine new unit substations 
  • All required building mechanical systems including installation of 34 new HVAC units and 20 associated condensing units and 20 associated condensing units set via helicopter 
  • All required building electrical systems, including approximately 6,000 linear feet of new 15 kV cable for tie-in to existing utility building and 42,000 linear feet of new 480V cable 
  • All required building fire suppression and life safety systems 
  • Building management systems 

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Lincoln, Alabama 
Owner: Honda Motor Company  
Project Value: $2,100,000

Line 2 Modifications

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Detroit, Michigan
Owner: EWI Worldwide
Project Value: $1,000,000

NAIAS Exhibit, Steel Framing

Location: Detroit, Michigan
Owner: Detroit Entertainment LLC
Project Value: $11,000,000
 

Facade Replacement

Location: Detroit, Michigan
Owner: Detroit Building Authority
Project Value: $3,500,000
 

Headquarters Building Restoration
Aristeo worked on site for over a year in good and nasty weather and through it all the company and all employees maintained a positive and professional attitude. Everybody I spoke with stated they would be very happy to see Aristeo return at any time for another project. Greater Gratiot Development, Inc.
|